Projects | |
|
|
|
|
Regional Airports Development Scheme |
 |
| Albany |
| Year: |
1999 |
| Project: |
Install Instrument Landing System (ILS) |
| Recipient: |
Southern Province Regional Development Organisation |
| RADS contribution: |
$200,000.00 |
| Total project cost: |
$800,000.00 |
| |
| Year: |
1995 |
| Project: |
Construct terminal |
| Recipient: |
City of Albany |
| RADS contribution: |
$180,000.00 |
| Total project cost: |
$1,135,000.00 |
| |
| Augusta |
| Year: |
2005 |
| Project: |
Construct and asphalt a helipad and construct a fuel storage facility |
| Recipient: |
Shire of Augusta-Margaret River |
| RADS contribution: |
$15,917.10 |
| Total project cost: |
$31,951.00 |
| |
| Year: |
2000 |
| Project: |
Master plan and Runway upgrade |
| Recipient: |
Shire of Augusta-Margaret River |
| RADS contribution: |
$132,970.00 |
| Total project cost: |
$182,901.40 |
| |
| Year: |
1998 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Augusta-Margaret River |
| RADS contribution: |
$6,000.00 |
| Total project cost: |
$8,175.00 |
|
|
| Balgo |
| Year: |
2007 |
| Project: |
Improve the airport safety equipment and airport building |
| Recipient: |
Aspen Monkey Mia Pty Ltd |
| RADS contribution: |
$77,000.00 |
| Total project cost: |
$154,545.44 |
| |
| Year: |
2003 |
| Project: |
Upgrade runways, improve fuel facilities and re-install fencing |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$67,800.00 |
| Total project cost: |
$180,000.00 |
| |
| Year: |
2000 |
| Project: |
Develop master plan |
| Recipient: |
Kimberley Development Commission |
| RADS contribution: |
$25,000.00 |
| Total project cost: |
$35,000.00 |
|
|
| Beacon |
| Year: |
2001 |
| Project: |
Runway upgrade |
| Recipient: |
Shire of Mt Marshall |
| RADS contribution: |
$14,000.00 |
| Total project cost: |
$27,867.16 |
|
|
| Beagle Bay |
| Year: |
2000 |
| Project: |
Install emergency lighting |
| Recipient: |
Kimberley Development Commission |
| RADS contribution: |
$25,000 |
| Total project cost: |
$31,209 |
|
|
| Bellburn |
| Year: |
2004 |
| Project: |
Upgrade the airstrip |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$123,760.00 |
| Total project cost: |
$1,035,671.00 |
|
|
| Bidyadanga |
| Year: |
2004 |
| Project: |
Construct an aircraft parking, run-up and tie-down area |
| Recipient: |
Bidyadanga Aboriginal Community La Grange Inc. |
| RADS contribution: |
$17,100.00 |
| Total project cost: |
$38,600.00 |
| |
| Year: |
2003 |
| Project: |
Refurbish the hangar |
| Recipient: |
Bidyadanga Aboriginal Community, Department of Housing and Works |
| RADS contribution: |
$9,436.00 |
| Total project cost: |
$21,531.00 |
| |
| Year: |
2001 |
| Project: |
Install fixed lighting |
| Recipient: |
Bidyadanga Aboriginal Community, Department of Housing and Works |
| RADS contribution: |
$95,000.00 |
| Total project cost: |
$115,000.00 |
| |
| Year: |
2000 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Bidyadanga Aboriginal Community La Grange Inc. |
| RADS contribution: |
$20,000.00 |
| Total project cost: |
$40,000.00 |
|
|
| Billiluna |
|
| Year: |
2003 |
| Project: |
Upgrade runway strip, replace markers, Upgrade lighting |
| Recipient: |
Mindibungu Aboriginal Corporation |
| RADS contribution: |
$71,250.00 |
| Total project cost: |
$142,500.00 |
| |
| Year: |
2000 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Mindibungu Aboriginal Corporation |
| RADS contribution: |
$11,296.00 |
| Total project cost: |
$17,470.43 |
|
|
| Blackstone |
| Year: |
2001 |
| Project: |
Install mains powered lighting |
| Recipient: |
Shire of Westonia |
| RADS contribution: |
$39,000.00 |
| Total project cost: |
$78,000.00 |
|
|
| Bremer Bay |
| Year: |
2000 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Jerramungup |
| RADS contribution: |
$27,819.00 |
| Total project cost: |
$52,150.00 |
| |
| Year: |
1999 |
| Project: |
Upgrade airstrip |
| Recipient: |
Shire of Jerramungup |
| RADS contribution: |
$134,250.00 |
| Total project cost: |
$428,640.00 |
|
|
| Brooklands |
| Year: |
2005 |
| Project: |
Seal both runways |
| Recipient: |
Skydive Express WA Pty Ltd |
| RADS contribution: |
$163,484.00 |
| Total project cost: |
$327,484.00 |
|
|
| Bruce Rock |
| Year: |
2001 |
| Project: |
Upgrade airstrip |
| Recipient: |
Shire of Bruce Rock |
| RADS contribution: |
$70,000.00 |
| Total project cost: |
$235,938.00 |
|
|
| Bunbury |
| Year: |
2006 |
| Project: |
Construct new taxiways |
| Recipient: |
City of Bunbury |
| RADS contribution: |
$170,000.00 |
| Total project cost: |
$407,575.00 |
| |
| Year: |
2004 |
| Project: |
Install standby power |
| Recipient: |
City of Bunbury |
| RADS contribution: |
$14,948.50 |
| Total project cost: |
$29,897.00 |
| |
| Year: |
2001 |
| Project: |
Construct vermin-proof fencing |
| Recipient: |
City of Bunbury |
| RADS contribution: |
$13,485.00 |
| Total project cost: |
$29,927.15 |
| |
| Year: |
1999 |
| Project: |
Construct vermin-proof fencing |
| Recipient: |
City of Bunbury |
| RADS contribution: |
$3,978.85 |
| Total project cost: |
$15,915.42 |
| |
| Year: |
1998 |
| Project: |
Seal remaining 500m of runway |
| Recipient: |
City of Bunbury |
| RADS contribution: |
$32,115.00 |
| Total project cost: |
$68,330.00 |
|
|
| Burringurrah |
| Year: |
2007 |
| Project: |
Seal runway |
| Recipient: |
Shire of Kellerberrin |
| RADS contribution: |
$181,000.00 |
| Total project cost: |
$362,000.00 |
| |
| Year: |
2004 |
| Project: |
Upgrade the airstrip to RFDS requirements |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$56,500.00 |
| Total project cost: |
$113,000.00 |
|
|
| Busselton |
| Year: |
2007 |
| Project: |
Construct animal fencing |
| Recipient: |
Shire of Busselton |
| RADS contribution: |
$55,000.00 |
| Total project cost: |
$110,000.00 |
| |
| Year: |
2001 |
| Project: |
Approval & Application of CTAF at Busselton Airport and AFRU |
| Recipient: |
Shire of Busselton |
| RADS contribution: |
$1,285.91 |
| Total project cost: |
$2,571.82 |
| |
| Year: |
2000 |
| Project: |
Install refuelling facility |
| Recipient: |
Shire of Busselton |
| RADS contribution: |
$46,000.00 |
| Total project cost: |
$116,193.38 |
| |
| Year: |
1996 |
| Project: |
Construct new airport |
| Recipient: |
Shire of Busselton |
| RADS contribution: |
$3,500,000.00 |
| Total project cost: |
$5,500,000.00 |
|
|
| Carnarvon |
| Year: |
2006 |
| Project: |
Commission of a geotechnical survey on the existing runway |
| Recipient: |
Shire of Carnarvon |
| RADS contribution: |
$43,900.00 |
| Total project cost: |
$87,590.00 |
| |
| Year: |
2004 |
| Project: |
Commission an airport master plan |
| Recipient: |
Shire of Carnarvon |
| RADS contribution: |
$15,000.00 |
| Total project cost: |
$30,000.00 |
| |
| Year: |
2003 |
| Project: |
Upgrade airport lighting |
| Recipient: |
Shire of Carnarvon |
| RADS contribution: |
$68,210.00 |
| Total project cost: |
$143,892.00 |
|
|
| Cervantes |
| Year: |
2001 |
| Project: |
Install turn around areas and a hard stand |
| Recipient: |
Shire of Dandaragan |
| RADS contribution: |
$22,950.00 |
| Total project cost: |
$57,869.03 |
|
|
| Collie |
| Year: |
2003 |
| Project: |
Airport Perimeter Fencing |
| Recipient: |
Shire of Collie |
| RADS contribution: |
$21,500.00 |
| Total project cost: |
$43,008.05 |
| |
| Year: |
1999 |
| Project: |
Seal apron, taxiway and thresholds of both runways |
| Recipient: |
Shire of Collie |
| RADS contribution: |
$13,000.00 |
| Total project cost: |
$26,541.00 |
|
|
| Coral Bay |
| Year: |
2006 |
| Project: |
Interim Upgrade (to CASA standards) |
| Recipient: |
Department for Planning and Infrastructure Aviation |
| RADS contribution: |
$200,000.00 |
| Total project cost: |
$200,000.00 |
|
|
| Corrigin |
| Year: |
2001 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Corrigin |
| RADS contribution: |
$1,745.00 |
| Total project cost: |
$3,538.90 |
|
|
| Cue |
| Year: |
2003 |
| Project: |
Install pilot activated lights, automatic weather station and electronic kangaroo guard |
| Recipient: |
Shire of Cue |
| RADS contribution: |
$23,000.00 |
| Total project cost: |
$47,920.00 |
|
|
| Cunderdin |
| Year: |
2206 |
| Project: |
Construct a patient transfer facility |
| Recipient: |
Shire of Cunderdin |
| RADS contribution: |
$13,395.00 |
| Total project cost: |
$27,870.00 |
| |
| Year: |
1998 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Cunderdin |
| RADS contribution: |
$10,000.00 |
| Total project cost: |
$14,984.00 |
|
|
| Denmark |
| Year: |
2003 |
| Project: |
Upgrade, extend runway, install pilot activated lighting and fence the airport |
| Recipient: |
Shire of Denmark |
| RADS contribution: |
$199,781.00 |
| Total project cost: |
$434,455.67 |
|
|
| Derby |
| Year: |
2007 |
| Project: |
Construct animal fencing |
| Recipient: |
Aboriginal Affairs Department, Ministry for Housing and Aboriginal & Torres Straits Islander Commission |
| RADS contribution: |
$211,000.00 |
| Total project cost: |
$504,405.00 |
| |
| Year: |
1998 |
| Project: |
Re-seal runway |
| Recipient: |
Shire of Derby-West Kimberley |
| RADS contribution: |
$500,000.00 |
| Total project cost: |
$771,425.91 |
|
|
| Djugerari |
| Year: |
2005 |
| Project: |
Relocate runway and aircraft parking area, install fencing, marking and wind sock |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$104,000.00 |
| Total project cost: |
$266,804.00 |
|
|
| Dongara |
| Year: |
2007 |
| Project: |
Construct animal fencing |
| Recipient: |
Shire of Irwin |
| RADS contribution: |
$36,000.00 |
| Total project cost: |
$73,633.00 |
| |
| Year: |
2006 |
| Project: |
Seal the runway and turning nodes and clear vegetation from approach areas |
| Recipient: |
Shire of Irwin |
| RADS contribution: |
$86,905.00 |
| Total project cost: |
$204,436.50 |
| |
| Year: |
2000 |
| Project: |
Extend runway, install runway lighting |
| Recipient: |
Shire of Irwin |
| RADS contribution: |
$13,700.00 |
| Total project cost: |
$40,700.00 |
|
|
| Drysdale River |
| Year: |
2001 |
| Project: |
Extend runway, install runway lighting |
| Recipient: |
Drysdale River Station |
| RADS contribution: |
$9,155.55 |
| Total project cost: |
$18,922.68 |
|
|
| East Wallabi Island |
| Year: |
2007 |
| Project: |
Upgrade the runway |
| Recipient: |
Department of Fisheries |
| RADS contribution: |
$42,600.00 |
| Total project cost: |
$85,302.73 |
|
|
| Esperance |
| Year: |
2006 |
| Project: |
Asphalt overlay the taxiway and apron |
| Recipient: |
Shire of Esperance |
| RADS contribution: |
$136,485.00 |
| Total project cost: |
|
| |
| Year: |
2003 |
| Project: |
Extend the runway |
| Recipient: |
Shire of Esperance |
| RADS contribution: |
$179,107.90 |
| Total project cost: |
$778,730.00 |
| |
| Year: |
2000 |
| Project: |
Master plan |
| Recipient: |
Shire of Esperance |
| RADS contribution: |
$20,250.81 |
| Total project cost: |
$22,659.00 |
|
|
| Fitzroy Crossing |
| Year: |
2005 |
| Project: |
Bitumen resealing of the runway |
| Recipient: |
Shire of Derby-West Kimberley |
| RADS contribution: |
$137,850.00 |
| Total project cost: |
$297,299.68 |
| |
| Year: |
2000 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Derby-West Kimberley |
| RADS contribution: |
$34,590.00 |
| Total project cost: |
$114,277.82 |
| |
| Year: |
1996 |
| Project: |
Seal runway |
| Recipient: |
Shire of Derby-West Kimberley |
| RADS contribution: |
$1,000,000.00 |
| Total project cost: |
$1,000,000.00 |
|
|
| Forrest |
| Year: |
1998 |
| Project: |
Install power generators |
| Recipient: |
Fayburn Pty Ltd |
| RADS contribution: |
$35,102.00 |
| Total project cost: |
$50,873.00 |
|
|
| Gascoyne Junction |
| Year: |
2004 |
| Project: |
Install animal proof fencing |
| Recipient: |
Shire of Upper Gascoyne |
| RADS contribution: |
$26,255.61 |
| Total project cost: |
$52,511.21 |
| |
| Year: |
1999 |
| Project: |
Seal runway |
| Recipient: |
Shire of Upper Gascoyne |
| RADS contribution: |
$150,000.00 |
| Total project cost: |
$295,000.00 |
|
|
| Geraldton |
| Year: |
2007 |
| Project: |
Replace standby power generator system |
| Recipient: |
Shire of Greenough |
| RADS contribution: |
$41,000.00 |
| Total project cost: |
$164,580.00 |
| |
| Year: |
2005 |
| Project: |
Asphalt and line mark runway 14/32 |
| Recipient: |
Shire of Greenough |
| RADS contribution: |
$120,000.00 |
| Total project cost: |
$428,678.61 |
| |
| Year: |
2000 |
| Project: |
Construct new airport terminal |
| Recipient: |
Shire of Greenough |
| RADS contribution: |
$250,000.00 |
| Total project cost: |
$3,600,000.00 |
| |
| Year: |
1998 |
| Project: |
Re-seal runway |
| Recipient: |
Shire of Greenough |
| RADS contribution: |
$400,000.00 |
| Total project cost: |
$2,000,000.00 |
|
|
| Gnaraloo Station |
| Year: |
2007 |
| Project: |
Extend the runway, construct turnaround areas, apron and taxiway and install markers, windsock and lighting |
| Recipient: |
Shire of Morawa |
| RADS contribution: |
$57,000.00 |
| Total project cost: |
$114,400.00 |
|
|
| Gnowangerup |
| Year: |
2007 |
| Project: |
Seal the runway and construct a patient transfer facility |
| Recipient: |
Southern Province Regional Development Organisation |
| RADS contribution: |
$54,000.00 |
| Total project cost: |
$216,121.00 |
| |
| Year: |
2003 |
| Project: |
Erect animal fencing |
| Recipient: |
Shire of Gnowangerup |
| RADS contribution: |
$16,833.11 |
| Total project cost: |
$33,666.22 |
| |
| Year: |
2000 |
| Project: |
Re-seal apron |
| Recipient: |
Shire of Gnowangerup |
| RADS contribution: |
$17,500.00 |
| Total project cost: |
$35,000.00 |
| |
| Year: |
1998 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Gnowangerup |
| RADS contribution: |
$4,500.00 |
| Total project cost: |
$6,350.00 |
|
|
| Halls Creek |
| Year: |
2005 |
| Project: |
Improve sight lines between the two runways |
| Recipient: |
Shire of Halls Creek |
| RADS contribution: |
$10,039.75 |
| Total project cost: |
$20,079.51 |
| |
| Year: |
2004 |
| Project: |
Install animal proof fencing |
| Recipient: |
Shire of Halls Creek |
| RADS contribution: |
$60,000.00 |
| Total project cost: |
$323,850.69 |
| |
| Year: |
1996 |
| Project: |
Seal runway, install pilot activated lighting |
| Recipient: |
Shire of Halls Creek |
| RADS contribution: |
$1,000,000.00 |
| Total project cost: |
$1,000,000.00 |
|
|
| Home Valley |
| Year: |
2005 |
| Project: |
Upgrade the runway, taxiway and apron |
| Recipient: |
Indigenous Land Corporation |
| RADS contribution: |
$77,615.00 |
| Total project cost: |
$250,992.00 |
|
|
| Jerramungup |
| Year: |
2000 |
| Project: |
Seal hardstand & taxiway, upgrade main runway markers |
| Recipient: |
Shire of Jerramungup |
| RADS contribution: |
$9,100.00 |
| Total project cost: |
$18,200.00 |
|
|
| Jigalong |
| Year: |
2004 |
| Project: |
Widen the airstrip and upgrade the lighting |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$171,940.00 |
| Total project cost: |
$343,890.00 |
| |
| Year: |
2003 |
| Project: |
Install pilot activated ,solar powered lighting |
| Recipient: |
Western Desert Puntukurnuparna Aboriginal Corporation |
| RADS contribution: |
$23,380.00 |
| Total project cost: |
$54,200.00 |
|
|
| Jurien Bay |
| Year: |
2004 |
| Project: |
Seal the runway, install runway lighting and fencing |
| Recipient: |
Shire of Dandaragan |
| RADS contribution: |
$130,000.00 |
| Total project cost: |
$383,824.00 |
| |
| Year: |
1998 |
| Project: |
Construct hardstand area |
| Recipient: |
Shire of Dandaragan |
| RADS contribution: |
$8,250.00 |
| Total project cost: |
$16,440.00 |
|
|
| Kadjina |
| Year: |
2004 |
| Project: |
Upgrade the airstrip to RFDS requirements |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$131,150.00 |
| Total project cost: |
$262,300.00 |
|
|
| Kalbarri |
| Year: |
1999 |
| Project: |
Construct new airport |
| Recipient: |
Shires of Greenough and Northampton |
| RADS contribution: |
$924,000.00 |
| Total project cost: |
$1,400,000.00 |
|
|
| Kalumburu |
| Year: |
2001 |
| Project: |
Aerodrome upgrade and Pilot Activated Lighting |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$250,000.00 |
| Total project cost: |
$570,000.00 |
|
|
| Karijini |
| Year: |
2001 |
| Project: |
Upgrade Karijini Airstrip |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$95,450.00 |
| Total project cost: |
$190,900.00 |
|
|
| Katanning |
| Year: |
2004 |
| Project: |
Install cross strip runway lights and connect to the existing PAL system |
| Recipient: |
Shire of Katanning |
| RADS contribution: |
$23,820.00 |
| Total project cost: |
$47,652.00 |
| |
| Year: |
2003 |
| Project: |
Erect animal fencing and upgrade the cross-runway |
| Recipient: |
Town of Port Hedland |
| RADS contribution: |
$35,023.00 |
| Total project cost: |
$109,763.22 |
| |
| Year: |
1999 |
| Project: |
Seal apron and install lighting, |
| Recipient: |
Shire of Katanning |
| RADS contribution: |
$15,903.00 |
| Total project cost: |
$37,493.38 |
|
|
| Kellerberrin |
| Year: |
2006 |
| Project: |
Seal the taxiway and aircraft parking area |
| Recipient: |
Shire of Kellerberrin |
| RADS contribution: |
$17,055.00 |
| Total project cost: |
$34,110.00 |
| |
| Year: |
2001 |
| Project: |
Widen landing strip |
| Recipient: |
Shire of Kellerberrin |
| RADS contribution: |
$39,645.00 |
| Total project cost: |
$80,094.49 |
|
|
| Kojonup |
| Year: |
1998 |
| Project: |
Seal runway thresholds, taxiway & hardstand |
| Recipient: |
Shire of Kojonup |
| RADS contribution: |
$14,080.00 |
| Total project cost: |
$29,486.28 |
|
|
| Kondinin |
| Year: |
2004 |
| Project: |
Construct a patient transfer shed, sealed run-up area and extend the runway to RFDS requirements and upgrade the lighting with PAL |
| Recipient: |
Shire of Kondinin |
| RADS contribution: |
$60,200.00 |
| Total project cost: |
$178,000.00 |
|
|
| Kulin |
| Year: |
2004 |
| Project: |
Extend the runway and upgrade the markings |
| Recipient: |
Shire of Kulin |
| RADS contribution: |
$16,784.15 |
| Total project cost: |
$33,568.30 |
|
|
| Kunawarritji |
| Year: |
2003 |
| Project: |
Erect a fuel shed |
| Recipient: |
Western Desert Puntukurnuparna Aboriginal Corporation |
| RADS contribution: |
$3,960.00 |
| Total project cost: |
$8,160.00 |
| |
| Year: |
2000 |
| Project: |
$8,160.00 |
| Recipient: |
Kunawarritji Aboriginal Community |
| RADS contribution: |
$20,000.00 |
| Total project cost: |
$40,000.00 |
|
|
| Kununoppin |
| Year: |
2006 |
| Project: |
Seal runway and taxiway to parking area |
| Recipient: |
Shire of Trayning |
| RADS contribution: |
$72,564.00 |
| Total project cost: |
$152,606.00 |
|
|
| Kununurra |
| Year: |
2004 |
| Project: |
Reseal and remark the runway and taxiways |
| Recipient: |
Shire of Wyndham - East Kimberley |
| RADS contribution: |
$55,511.76 |
| Total project cost: |
$252,326.19 |
|
|
| Kupartiya |
| Year: |
2005 |
| Project: |
install aircraft parking area and boundary fencing |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$18,800.00 |
| Total project cost: |
$37,600.00 |
| |
| Year: |
2003 |
| Project: |
Upgrade the runway and aircraft parking area |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$39,825.00 |
| Total project cost: |
$39,825.00 |
|
|
| Lake Grace |
| Year: |
2005 |
| Project: |
Sealing and line marking the runway, re-sealing and upgrading the patient transfer area |
| Recipient: |
Shire of Lake Grace |
| RADS contribution: |
$32,249.00 |
| Total project cost: |
$73,871.75 |
| |
| Year: |
2004 |
| Project: |
Install kangaroo proof fencing |
| Recipient: |
Shire of Lake Grace |
| RADS contribution: |
$12,971.06 |
| Total project cost: |
$25,942.13 |
| |
| Year: |
2003 |
| Project: |
Seal the runway ends |
| Recipient: |
Shire of Lake Grace |
| RADS contribution: |
$3,481.70 |
| Total project cost: |
$5,803.52 |
| |
| Year: |
1999 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Lake Grace |
| RADS contribution: |
$10,904.00 |
| Total project cost: |
$25,358.14 |
|
|
| Laverton |
| Year: |
2003 |
| Project: |
Erect vermin proof fencing |
| Recipient: |
Shire of Laverton |
| RADS contribution: |
$49,071.00 |
| Total project cost: |
$107,529.00 |
| |
| Year: |
1998 |
| Project: |
Extend apron, widen taxiway |
| Recipient: |
Shire of Laverton |
| RADS contribution: |
$30,000.00 |
| Total project cost: |
$77,541.23 |
| |
|
| Learmonth |
| Year: |
2004 |
| Project: |
Purchase and installation of an explosives and narcotics detection unit |
| Recipient: |
Shire of Exmouth |
| RADS contribution: |
$72,000.00 |
| Total project cost: |
$72,300.00 |
| |
| Year: |
1998 |
| Project: |
Upgrade & extend apron & taxiway |
| Recipient: |
Shire of Exmouth |
| RADS contribution: |
$500,000.00 |
| Total project cost: |
$5,200,000.00 |
|
|
| Leonora |
| Year: |
2000 |
| Project: |
Seal runway & apron, install runway lighting |
| Recipient: |
Shire of Leonora |
| RADS contribution: |
$185,000.00 |
| Total project cost: |
$1,400,000.00 |
| |
| Year: |
1999 |
| Project: |
Extend the runway and the runway lighting |
| Recipient: |
Shire of Leonora |
| RADS contribution: |
$150,000.00 |
| Total project cost: |
$375,000.00 |
|
|
| Lombadina/Dampier Peninsula |
| Year: |
1998 |
| Project: |
Seal airstrip |
| Recipient: |
Aboriginal Affairs Department, Ministry for Housing and Aboriginal & Torres Straits Islander Commission |
| RADS contribution: |
$250,000.00 |
| Total project cost: |
$800,000.00 |
|
|
| Louisa Downs |
| Year: |
2005 |
| Project: |
Construction of airport |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$104,000.00 |
| Total project cost: |
$244,320.30 |
|
|
| Manjimup |
| Year: |
2003 |
| Project: |
Extend the aircraft parking apron |
| Recipient: |
Shire of Manjimup |
| RADS contribution: |
$20,000.00 |
| Total project cost: |
$65,911.47 |
| |
| Year: |
2000 |
| Project: |
Develop master plan, seal aircraft parking area |
| Recipient: |
Shire of Manjimup |
| RADS contribution: |
$7,660.00 |
| Total project cost: |
$12,810.80 |
| |
| Year: |
1997 |
| Project: |
Install Non-Directional Beacon (NDB) |
| Recipient: |
Shire of Manjimup |
| RADS contribution: |
$250,000.00 |
| Total project cost: |
$250,000.00 |
| |
| Year: |
1997 |
| Project: |
Widen runway |
| Recipient: |
Shire of Manjimup |
| RADS contribution: |
$20,000.00 |
| Total project cost: |
$99,750.00 |
|
|
| Marble Bar |
| Year: |
2005 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of East Pilbara |
| RADS contribution: |
$78,617.00 |
| Total project cost: |
$157,456.98 |
|
|
| Margaret River |
| Year: |
1999 |
| Project: |
Construct and seal second taxiway and apron and install a terminal building |
| Recipient: |
Shire of Augusta-Margaret River |
| RADS contribution: |
$32,000.00 |
| Total project cost: |
$38,022.88 |
| |
| Year: |
1999 |
| Project: |
Extend apron, widen runway seal |
| Recipient: |
Shire of Augusta-Margaret River |
| RADS contribution: |
$46,516.00 |
| Total project cost: |
$68,406.34 |
| |
| Year: |
1997 |
| Project: |
Seal airstrip |
| Recipient: |
Shire of Augusta-Margaret River |
| RADS contribution: |
$33,489.00 |
| Total project cost: |
$58,618.39 |
| |
| Year: |
1996 |
| Project: |
Install pilot activated lighting |
| Recipient: |
Shire of Augusta-Margaret River |
| RADS contribution: |
$30,000.00 |
| Total project cost: |
$60,293.06 |
|
|
| Marion Downs |
| Year: |
2005 |
| Project: |
Relocate airstrip |
| Recipient: |
Marion Downs Station |
| RADS contribution: |
$25,730.00 |
| Total project cost: |
$51,459.00 |
|
|
| Meekatharra |
| Year: |
2005 |
| Project: |
Install a pilot activated lighting control, aerodrome frequency response unit and replace damaged runway markers |
| Recipient: |
Shire of Meekatharra |
| RADS contribution: |
$5,881.95 |
| Total project cost: |
$11,763.90 |
| |
| Year: |
2003 |
| Project: |
Reseal and mark aprons, replace markers and purchase radios |
| Recipient: |
Shire of Meekatharra |
| RADS contribution: |
$37,992.00 |
| Total project cost: |
$77,448.84 |
|
|
| Merredin |
| Year: |
2004 |
| Project: |
Construct aircraft hangars and improve runway condition |
| Recipient: |
China Southern Western Australian Flying College |
| RADS contribution: |
$125,000.00 |
| Total project cost: |
$336,064.00 |
| |
| Year: |
2003 |
| Project: |
Upgrade the secondary runway |
| Recipient: |
China Southern Western Australian Flying College |
| RADS contribution: |
$36,750.00 |
| Total project cost: |
$76,400.00 |
| |
| Year: |
2001 |
| Project: |
Construct patient transfer facility |
| Recipient: |
China Southern Western Australian Flying College |
| RADS contribution: |
$5,500.00 |
| Total project cost: |
$19,309.41 |
|
|
| Moora |
| Year: |
2003 |
| Project: |
Create a Master Plan for a new airstrip |
| Recipient: |
Shire of Moora |
| RADS contribution: |
$6,750.00 |
| Total project cost: |
$13,500.00 |
|
|
| Morawa |
| Year: |
2006 |
| Project: |
Construct turning nodes |
| Recipient: |
Shire of Morawa |
| RADS contribution: |
$36,123.00 |
| Total project cost: |
$71,980.00 |
| |
| Year: |
2004 |
| Project: |
Install pilot activation system for the runway lighting |
| Recipient: |
Shire of Morawa |
| RADS contribution: |
$4,163.00 |
| Total project cost: |
$8,326.00 |
| |
| Year: |
2003 |
| Project: |
Carry out repairs to the airstrip and salinity alleviation work |
| Recipient: |
Shire of Morawa |
| RADS contribution: |
$21,900.00 |
| Total project cost: |
$44,581.00 |
| |
| Year: |
1999 |
| Project: |
Gravel & re-sheet main runway |
| Recipient: |
Shire of Morawa |
| RADS contribution: |
$5,000.00 |
| Total project cost: |
$12,081.00 |
|
|
| Mt Elizabeth |
| Year: |
2003 |
| Project: |
Upgrade the airstrip |
| Recipient: |
Mt Elizabeth Station |
| RADS contribution: |
$69,027.00 |
| Total project cost: |
$147,528.00 |
|
|
| Mt Hart |
| Year: |
2005 |
| Project: |
Widen the runway to 90m, improve the splay areas, construct a taxi way and install cone markers |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$15,200.77 |
| Total project cost: |
$30,401.57 |
| |
| Year: |
2004 |
| Project: |
Upgrade the runway to RFDS requirements |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$68,800.00 |
| Total project cost: |
$140,000.00 |
|
|
| Mt House Station |
| Year: |
2003 |
| Project: |
Upgrade the airstrip |
| Recipient: |
Mt House Pastoral Partnership |
| RADS contribution: |
$58,750.00 |
| Total project cost: |
$117,500.00 |
|
|
| Mt Magnet |
| Year: |
2003 |
| Project: |
Seal mark and fence the runway |
| Recipient: |
Shire of Mount Magnet |
| RADS contribution: |
$187,533.76 |
| Total project cost: |
$375,067.49 |
| |
| Year: |
2000 |
| Project: |
Seal runway |
| Recipient: |
Shire of Mount Magnet |
| RADS contribution: |
$250,000.00 |
| Total project cost: |
$505,984.00 |
| |
| Year: |
1999 |
| Project: |
Install beep back radio unit (safety aid), re-seal apron |
| Recipient: |
Shire of Mount Magnet |
| RADS contribution: |
$16,883.00 |
| Total project cost: |
$43,000.00 |
|
|
| Mugarinya |
| Year: |
2003 |
| Project: |
Reconstruct and fence the airstrip and re-sheet the aircraft parking apron |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$200,000.00 |
| Total project cost: |
$400,000.00 |
|
|
| Mukinbudin |
| Year: |
2005 |
| Project: |
Install vermin proof fencing |
| Recipient: |
Shire of Mukinbudin |
| RADS contribution: |
$43,000 |
| Total project cost: |
$87,296 |
| |
| Year: |
2003 |
| Project: |
Upgrade the airstrip surface |
| Recipient: |
Shire of Mukinbudin |
| RADS contribution: |
$25,000.00 |
| Total project cost: |
$60,264.06 |
|
|
| Mulan |
| Year: |
2007 |
| Project: |
Install Pilot Activated Lighting and floodlights for the windsock and apron |
| Recipient: |
Mulan Aboriginal Corporation |
| RADS contribution: |
$113,000.00 |
| Total project cost: |
$227,272.72 |
| |
| Year: |
2000 |
| Project: |
Install airstrip lighting, apron lighting & windsock |
| Recipient: |
Mulan Aboriginal Corporation |
| RADS contribution: |
$46,461.00 |
| Total project cost: |
$106,593.54 |
|
|
| Munjina/Auski |
| Year: |
1996 |
| Project: |
Construct airstrip |
| Recipient: |
Munjina |
| RADS contribution: |
$250,000.00 |
| Total project cost: |
$250,000.00 |
|
|
| Murchison |
| Year: |
2004 |
| Project: |
Upgrade the airstrip, construct runway turning nodes, a parking area and remarking |
| Recipient: |
Shire of Murchison |
| RADS contribution: |
$28,000.00 |
| Total project cost: |
$74,061.34 |
|
|
| Murrayfield |
| Year: |
2007 |
| Project: |
Extend taxiway 05/23 |
| Recipient: |
Shire of Esperance |
| RADS contribution: |
$72,000.00 |
| Total project cost: |
$144,626.00 |
| |
| Year: |
1999 |
| Project: |
Seal runway, install pilot activated lighting |
| Recipient: |
Royal Aero Club of Western Australia |
| RADS contribution: |
$200,000.00 |
| Total project cost: |
$250,000.00 |
|
|
| Nannup |
| Year: |
2001 |
| Project: |
Upgrade runway to RFDS standards |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$24,000.00 |
| Total project cost: |
$64,470.00 |
|
|
| Nanutarra |
| Year: |
1997 |
| Project: |
Construct emergency landing area on North West Coastal Hwy |
| Recipient: |
Main Roads Western Australia |
| RADS contribution: |
$200,000.00 |
| Total project cost: |
$200,000.00 |
|
|
| Narembeen |
| Year: |
2006 |
| Project: |
Resurface existing runway and taxiway, install new taxiway and extend current runway |
| Recipient: |
Shire of Carnarvon |
| RADS contribution: |
$29,933.00 |
| Total project cost: |
$67,613.00 |
|
|
| Narrogin |
| Year: |
2004 |
| Project: |
Improve the drainage, upgrade the runway marking and the boundary fencing |
| Recipient: |
Town of Narrogin |
| RADS contribution: |
$10,170.34 |
| Total project cost: |
$21,293.00 |
| |
| Year: |
2003 |
| Project: |
Upgrade pilot activated lights, sealed taxiway and aircraft parking |
| Recipient: |
Town of Narrogin |
| RADS contribution: |
$6,525.50 |
| Total project cost: |
$13,051.00 |
| |
| Year: |
2000 |
| Project: |
Master plan |
| Recipient: |
Town of Narrogin |
| RADS contribution: |
$4,000.00 |
| Total project cost: |
$8,987.00 |
| |
| Year: |
1999 |
| Project: |
Seal runway |
| Recipient: |
Town of Narrogin |
| RADS contribution: |
$46,000.00 |
| Total project cost: |
$140,265.47 |
|
|
| Newman |
| Year: |
2006 |
| Project: |
Construct new terminal |
| Recipient: |
Shire of East Pilbara |
| RADS contribution: |
$2,000,000.00 |
| Total project cost: |
$9,800,000.00 |
| |
| Year: |
2004 |
| Project: |
Part 2 design a new passenger terminal |
| Recipient: |
Shire of East Pilbara |
| RADS contribution: |
$75,000.00 |
| Total project cost: |
$150,000.00 |
| |
| Year: |
2004 |
| Project: |
Upgrade the airport |
| Recipient: |
Shire of East Pilbara |
| RADS contribution: |
$144,400.00 |
| Total project cost: |
$777,102.36 |
| |
| Year: |
2003 |
| Project: |
Part 1 design a new passenger terminal |
| Recipient: |
Shire of East Pilbara |
| RADS contribution: |
$100,000.00 |
| Total project cost: |
$242,753.26 |
|
|
| Norseman |
| Year: |
2004 |
| Project: |
Develop an airport masterplan |
| Recipient: |
Shire of Dundas |
| RADS contribution: |
$3,750.00 |
| Total project cost: |
$7,500.00 |
|
|
| Northam |
| Year: |
2005 |
| Project: |
Apply a second seal and construct a new taxiway |
| Recipient: |
Shire of Boyup Brook |
| RADS contribution: |
$103,052.00 |
| Total project cost: |
$206,105.00 |
| |
| Year: |
2005 |
| Project: |
Commission an airport master plan |
| Recipient: |
Town of Northam |
| RADS contribution: |
$6,600.00 |
| Total project cost: |
$21,600.00 |
| |
| Year: |
2000 |
| Project: |
Seal runway |
| Recipient: |
Northam Aero Club |
| RADS contribution: |
$82,100.00 |
| Total project cost: |
$163,928.00 |
|
|
| Nugadong |
| Year: |
2007 |
| Project: |
Widen the runway, construct turnaround area and patient transfer facility and install lighting and fencing |
| Recipient: |
Shire of Dalwallinu |
| RADS contribution: |
$120,000.00 |
| Total project cost: |
$464,000.00 |
| |
| Year: |
1998 |
| Project: |
Runway seal |
| Recipient: |
Shire of Dalwallinu |
| RADS contribution: |
$25,458.02 |
| Total project cost: |
$25,458.02 |
|
|
| Nullagine |
| Year: |
2007 |
| Project: |
Construct patient transfer and waiting facility with a public toilet |
| Recipient: |
Shire of East Pilbara |
| RADS contribution: |
$40,000.00 |
| Total project cost: |
$80,000.00 |
|
|
| One Arm Point |
| Year: |
2006 |
| Project: |
Upgrade the airport to Aircraft Landing Area (ALA) standards |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$75,500.00 |
| Total project cost: |
$153,800.00 |
|
|
| Onslow |
| Year: |
2004 |
| Project: |
Extend and seal runway 03/21 |
| Recipient: |
Department of Fisheries |
| RADS contribution: |
$174,240.00 |
| Total project cost: |
$695,228.00 |
| |
| Year: |
2000 |
| Project: |
Construct runway, install pilot activated lighting |
| Recipient: |
Shire of Ashburton |
| RADS contribution: |
$890,000.00 |
| Total project cost: |
$1,675,000.00 |
|
|
| Oombulgurri |
| Year: |
2000 |
| Project: |
Re-sheet & upgrade runway, strip, taxiway & apron, drainage works |
| Recipient: |
Aboriginal Housing, Department of Housing and Works |
| RADS contribution: |
$213,300.00 |
| Total project cost: |
$438,640.69 |
|
|
| Parnngurr |
| Year: |
2003 |
| Project: |
Erect a fuel shed and install pilot activated, solar powered lighting |
| Recipient: |
Western Desert Puntukurnuparna Aboriginal Corporation |
| RADS contribution: |
$27,340.00 |
| Total project cost: |
$62,360.00 |
| |
| Year: |
2000 |
| Project: |
Installation of emergency lighting, airport fencing, fuel storage shed and windsock |
| Recipient: |
Western Desert Puntukurnuparna Aboriginal Corporation |
| RADS contribution: |
$15,790.23 |
| Total project cost: |
$31,580.46 |
|
|
| Perenjori |
| Year: |
2000 |
| Project: |
Install beacon for pilot activated lighting |
| Recipient: |
Shire of Perenjori |
| RADS contribution: |
$5,000.00 |
| Total project cost: |
$14,625.00 |
|
|
| Port Hedland |
| Year: |
2007 |
| Project: |
Install runway and apron lighting and Precision Approach Path Indicator, extend Runway End Safety Area and develop airport master |
| Recipient: |
Town of Port Hedland |
| RADS contribution: |
$400,000.00 |
| Total project cost: |
$1,017,545.46 |
| |
| Year: |
1999 |
| Project: |
Re-seal aprons, construct turning nodes on runway |
| Recipient: |
Town of Port Hedland |
| RADS contribution: |
$272,079.66 |
| Total project cost: |
$630,000.00 |
|
|
| Punmu |
| Year: |
2003 |
| Project: |
Erect a fuel shed, install pilot activated, mains powered lighting |
| Recipient: |
Western Desert Puntukurnuparna Aboriginal Corporation |
| RADS contribution: |
$19,960.00 |
| Total project cost: |
$44,160.00 |
| |
| Year: |
2000 |
| Project: |
Installation of emergency lighting, airport fencing, fuel storage shed and windsock |
| Recipient: |
Western Desert Puntukurnuparna Aboriginal Corporation |
| RADS contribution: |
$15,790.23 |
| Total project cost: |
$31,580.46 |
|
|
| Ravensthorpe |
| Year: |
2001 |
| Project: |
Construction of a new aerodrome |
| Recipient: |
Coral Bay FESA Unit/Department for Planning and Infrastructure |
| RADS contribution: |
$350,000.00 |
| Total project cost: |
$3,600,000.00 |
|
|
| Sandfire |
| Year: |
1999 |
| Project: |
Re-sheet runway |
| Recipient: |
Sandfire Roadhouse |
| RADS contribution: |
$50,000.00 |
| Total project cost: |
$50,000.00 |
|
|
| Shark Bay |
| Year: |
2006 |
| Project: |
Install Perimeter Fencing (Animal Proof Fencing) |
| Recipient: |
Aspen Monkey Mia Pty Ltd |
| RADS contribution: |
$50,000.00 |
| Total project cost: |
$100,000.00 |
| |
| Year: |
2003 |
| Project: |
Install pilot activated runway lights |
| Recipient: |
Shark Bay Airport Pty Ltd |
| RADS contribution: |
$85,829.50 |
| Total project cost: |
$123,864.50 |
|
|
| Silent Grove |
| Year: |
2003 |
| Project: |
Upgrade the airstrip to RFDS standard |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$12,825.00 |
| Total project cost: |
$30,401.57 |
|
|
| Southern Cross |
| Year: |
2003 |
| Project: |
Replace runway turning node and provide uninterruptible power supply to runway lights |
| Recipient: |
Shire of Yilgarn |
| RADS contribution: |
$13,594.67 |
| Total project cost: |
$27,189.34 |
|
|
| Tjukayirla |
| Year: |
2000 |
| Project: |
Purchase of emergency lighting trailer |
| Recipient: |
Shire of Laverton |
| RADS contribution: |
$5,375.00 |
| Total project cost: |
$10,819.00 |
| |
| Year: |
1999 |
| Project: |
Construct RFDS emergency landing area on Great Central Road |
| Recipient: |
Shire of Laverton |
| RADS contribution: |
$75,000.00 |
| Total project cost: |
$285,406.25 |
|
|
| Tjuntjuntjara |
| Year: |
2004 |
| Project: |
Rework the airstrip, remark and provide a windsock |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$106,000.00 |
| Total project cost: |
$212,000.00 |
|
|
| Turkey Creek |
| Year: |
2005 |
| Project: |
Extend runway 21 by 200m, grade runway strip to 90m, remove vegetation from obstacle surface, install wind indicator, install marker |
| Recipient: |
Burringurrah Aboriginal Community Incorporated |
| RADS contribution: |
$54,500.00 |
| Total project cost: |
$110,970.00 |
|
|
| Varley |
| Year: |
2003 |
| Project: |
Install markers |
| Recipient: |
Shire of Kulin |
| RADS contribution: |
$2,146.00 |
| Total project cost: |
$4,292.00 |
|
|
| Wagin |
| Year: |
2004 |
| Project: |
Install airstrip fencing |
| Recipient: |
Shire of Wagin |
| RADS contribution: |
$23,302.94 |
| Total project cost: |
$46,605.88 |
| |
| Year: |
1999 |
| Project: |
Upgrade main & cross runways |
| Recipient: |
Shire of Wagin |
| RADS contribution: |
$20,000.00 |
| Total project cost: |
$85,236.00 |
|
|
| Walpole |
| Year: |
2003 |
| Project: |
Upgrade the airstrip |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$21,975.00 |
| Total project cost: |
$73,987.00 |
|
|
| Warburton |
| Year: |
2001 |
| Project: |
Seal airstrip and install pilot activated lighting |
| Recipient: |
Shire of Ngaanyatjarraku, Aboriginal and Torres Strait Islander Commission |
| RADS contribution: |
$300,000.00 |
| Total project cost: |
$863,204.11 |
|
|
| Wave Rock |
| Year: |
1997 |
| Project: |
Construct new airport |
| Recipient: |
Wave Rock Development Pty Ltd |
| RADS contribution: |
$308,000.00 |
| Total project cost: |
$627,700.00 |
|
|
| Wiluna |
| Year: |
1996 |
| Project: |
Seal runway |
| Recipient: |
Shire of Wiluna/Wiluna Gold |
| RADS contribution: |
$300,000.00 |
| Total project cost: |
$845,000.00 |
|
|
| Windidda |
| Year: |
2003 |
| Project: |
Erect a fuel shed and install solar powered pilot activated runway lights |
| Recipient: |
Western Desert Puntukurnuparna Aboriginal Corporation |
| RADS contribution: |
$27,340.00 |
| Total project cost: |
$51,540.00 |
|
|
| Windjana Gorge |
| Year: |
2006 |
| Project: |
Widen the runway and clear approach and take-off areas |
| Recipient: |
Department of Environment and Conservation |
| RADS contribution: |
$1,239.70 |
| Total project cost: |
$2,479.40 |
|
|
| Wongan Hills |
| Year: |
2003 |
| Project: |
Reconstruct and seal the runway and upgrade the lighting |
| Recipient: |
Shire of Wongan-Ballidu |
| RADS contribution: |
$209,375.00 |
| Total project cost: |
$451,889.58 |
| |
| Year: |
1998 |
| Project: |
Seal apron |
| Recipient: |
Shire of Wongan-Ballidu |
| RADS contribution: |
$7,400.00 |
| Total project cost: |
$8,344.80 |
|
|
| Wyalkatchem |
| Year: |
2006 |
| Project: |
Construct a patient transfer facility |
| Recipient: |
Shire of Wyalkatchem |
| RADS contribution: |
$35,000.00 |
| Total project cost: |
$79,241.00 |
| |
| Year: |
2003 |
| Project: |
Runway upgrade with final seal |
| Recipient: |
Shire of Wyalkatchem |
| RADS contribution: |
$9,744.93 |
| Total project cost: |
$20,301.94 |
| |
| Year: |
2000 |
| Project: |
Upgrade, extend & seal runway, install emergency lighting |
| Recipient: |
Shire of Wyalkatchem |
| RADS contribution: |
$85,000.00 |
| Total project cost: |
$278,359.98 |
|
|
| Wyndham |
| Year: |
2004 |
| Project: |
Upgrade the airport lighting |
| Recipient: |
Shire of Wyndham - East Kimberley |
| RADS contribution: |
$10,567.00 |
| Total project cost: |
$42,268.00 |
| |
| Year: |
2000 |
| Project: |
Install solar power warning lights |
| Recipient: |
Shire of Wyndham - East Kimberley |
| RADS contribution: |
$32,000.00 |
| Total project cost: |
$65,340.00 |
| |
| Year: |
1998 |
| Project: |
Upgrade and seal runway |
| Recipient: |
Shire of Wyndham - East Kimberley |
| RADS contribution: |
$100,000.00 |
| Total project cost: |
$580,000.00 |
|
|
 |
|
|
|
|
|